Intifix

Getting your home ready for painters, and living through the work

What to move, cover and empty before painting starts, how to handle fumes, ventilation, children and pets, and what a normal day of work should look like.

4 min read · Updated 19 August 2026

The more you clear before painters arrive, the faster and cleaner the job goes. Everything movable out of the room or into the middle, everything on the walls taken down, and anything fragile out of the house entirely if you can — that is the short version, and doing it the evening before saves a chunk of the first day.

Living through a paint job is mostly about ventilation and sequencing. Painting happens room by room, so you shift ahead of the crew into the rooms they have finished, keep windows open where they are working, and keep children and pets out of wet rooms until the film is hard.

Before the crew arrives

  • Take down everything on the walls — photos, clocks, mirrors, wall-mounted shelves, curtains and curtain rods. Keep the screws in a labelled bag.
  • Empty the room where you can. Small furniture, mattresses, cartons, floor mats. What cannot leave should be moved to the centre of the room, well clear of every wall.
  • Clear the switchboard area. Anything plugged in and hanging near a wall gets in the way and gets marked.
  • Pack away textiles. Curtains, bedding, clothes on open racks. Fine paint mist travels further than people expect.
  • Take valuables and breakables out of the working rooms altogether.
  • Point out every problem spot before work starts — old damp patches, cracks, hollow-sounding plaster, a switch that misbehaves, a wall you know has failed before. This changes the preparation and it is much better raised on day one.
  • Decide colours in advance, and see a sample on your own wall in daylight and at night. Shades look different under an LED bulb than on a shade card.
  • Sort out the practical bits: where the crew can wash brushes, where materials will be stacked, whether the lift or the stairs will be used, and if it is a flat, whether the association needs telling.

Fumes, ventilation and who should stay away

Water-based emulsion is comparatively mild but still needs air moving. Enamel, PU and lacquer on doors, grilles and furniture are much stronger and are the ones to take seriously.

  • Keep windows open on both sides of the working room where possible. Cross-ventilation matters far more than one open window.
  • Run a fan to move air out, not to blow dust onto a wet wall — position it to push air towards the window.
  • Keep children and pets out of rooms being worked in, and out of them until the coat is dry to touch. Wet emulsion on hands and paws goes everywhere.
  • Anyone with asthma or a breathing condition should stay out of the working area entirely, and out of the house for enamel and PU work if that is possible.
  • Do not sleep in a freshly painted room the same night if you have another option. Emulsion needs a night with the windows open; enamel needs longer.
  • Keep paint tins, thinners and solvents shut and out of reach. Store them away from the kitchen, away from any flame, and never decanted into a drink bottle.
  • Solvent-soaked cloths should not be left in a heap; spread them out to dry before disposal.

Ventilation is one of the few things that is genuinely harder in Nellore's wet months. In October to December, opening every window means humidity comes in and drying slows down. The answer is longer gaps between coats and patience, not shutting the room up with a wet coat inside it.

During the work — what normal looks like

A day with a competent crew looks like this: floors covered, furniture sheeted, switches and frames masked, preparation done first, then coats applied with proper gaps between them. Dust from sanding and scraping is normal and heavy on the preparation days; paint smell peaks on coating days.

Reasonable things to ask for: shoes off or covered on finished floors, tins closed at the end of the day, brushes washed outside rather than in your kitchen sink, and debris bagged rather than swept into a corner. Reasonable things to expect of yourself: keep the working rooms clear, keep the tea coming if you like, and stay out of the way of a wet wall.

Do not rush the crew into a second coat before the first is properly dry, especially in humid weather. A coat applied too early stays soft underneath and marks for weeks.

After the last coat

Give a room a full day before putting furniture back against the walls, and longer in humid weather. Refit curtain rods and wall fittings after that, not before — screws driven into a soft film tear it.

Walk each room in daylight with the crew and look at the finish in raking light from the window: missed patches, roller edges, colour bleeding onto ceilings or frames, splashes on switches and floors. Touch-ups belong in the same visit, not a call-back later.

Questions people ask

How long do paint smells take to clear?
Water-based emulsion loses most of its smell in a day or two with windows open and a fan running. Enamel and PU on doors and grilles are stronger and take longer, which is why door work is best done when the room can be left open and unused. Cross-ventilation clears a room far faster than an air freshener masks it.
Can we sleep in a room painted the same day?
Better not to, especially with young children, elderly family members or anyone with breathing trouble. Give an emulsion-painted room a night with the windows open and use another room if you can. For enamel or PU work, leave the room longer — the smell that lingers is the coating still curing.
Should we stay at home during the work or move out?
Most families stay. Painting is done room by room, so you can shift into finished rooms as the crew moves on. Moving out only makes sense for a full house repaint on a tight schedule, or when someone at home has asthma or a similar condition that the fumes and dust would aggravate.

Keep reading